DESIGN & BUILD ROADMAP

Studio Kaape follows a structured approach to interior design and delivery, guiding each project through the Design and Build phases, from preparation and concept development to production, installation, handover, and post-build follow-up.

This roadmap outlines the key activities within each phase. The specific timeline and duration will depend on the individual project.

01. DESIGN


Preparation

The initial stage focuses on establishing the project requirements and preparing the foundations for the design process.

Key Activities

  • Site survey

  • KYC (Know Your Customer)

  • Technical requirements

  • DWG / 3D model

  • Project management

  • Project pitch

  • Function plan analysis

Identity Strategy

This stage establishes the relationship between the branding and the interior design concept.

Key Activities

  • Branding and design concept

  • Interior design concept

  • Touch & Feel Guide

Stage 2:

Design Project

Function Planning & Selections

The design phase develops the functional plans, specifications, and selections required to define the interior.

Key Activities

  • All function plans and specifications

  • Branding and design concept implementation

  • Manufacture selection

  • Light selection

  • Material, finish and colour guide

  • Soft & accessories

  • Art curation

  • 3D visualisation

  • Showroom visit

  • Sample show

Bespoke Design & Implementation

This stage focuses on the development of bespoke interior elements.

Key Activities

  • Carpenter work & bespoke joinery

  • Light design


03. POST-BUILD FOLLOW-UP


02. BUILD


Stage 3:

Post-Design

Sub-Contractor Build Partner

This stage covers the coordination and preparation activities associated with the appointed build partner and relevant project suppliers.

Key Activities

  • FF&E

  • Quantity surveying

  • Quotation & order

  • Shop drawing confirmation

  • Site survey

  • Quality check mock-up / sample show

Production & Delivery

This stage covers the production and delivery activities leading to the completion and handover of the project.

Key Activities

  • Production

  • Shipping

  • Installation

  • Project hand-over

Snag Period & Aftermath

Following project handover, the roadmap includes a snag period and scheduled follow-up surveys.

Key Activities

  • O&M Manual (Operations & Management Manual)

  • 1 month survey

  • 6 months survey

  • 1 year survey

DESIGN & BUILD

The Design and Build phases bring together the activities required to develop the interior design, coordinate its implementation, and complete the project through handover and post-build follow-up.

The roadmap provides an overview of the process, from initial preparation and design development to production, installation, and subsequent surveys.

Stage 1:

Pre-Project